Rated Power : 250KW 2000rmp
Bucket Capacity : 2.0 – 2.5 m³
Engine : Cummins QSM11
Operating Weight : 44900kg
SH470/500-9 series products improve efficiency by 12% and reduce fuel consumption by 8% compared to the original-8 products.
Cummins QSM11 engine, reliable, high efficiency, low fuel consumption
Power: 250Kw/280Kw
Speed: 1850rpm
Adopting electronic control for high-pressure fuel injection to optimize fuel injection and reduce fuel consumption. Synchronized control reduces excess engine rotation under light operation, reducing fuel consumption and noise.
High efficiency
High response
Large displacement
Various control methods
High power output density
High self-priming capability
High reliability
Linear travel circuit
Arm priority, arm priority in combination of arm and bucket bar operation
Slewing priority, slewing priority for bucket and boom slewing combined operation
Bucket merge, backup merge circuit
Bucket lever regeneration
Bucket arm regeneration
Bucket length: 3000mm
Bucket digging force: 246
Powerful digging force (same ton class upgrade)
Bucket digging force: 2,290KN
Shortened digging cycle time due to agile slewing
Slewing speed: 9.3r/min
Extended continuous operation time
Adoption of large-capacity 650L fuel tank
20% longer operating time due to excellent fuel saving performance
SH470-9 Hydraulic Crawler Excavator | |
Operating Weight and Ground Pressure | |
Operating weight | 44900Kg |
Ground pressure | 80.2KPa |
Engine | |
Mode | Cummins QSM11 |
Type | 6 cylinder inline; turbocharged;intercooling |
No. of cylinder | 6 |
Bore and stroke | 6X125X150(mm) |
Displacement | 11L |
Power output | 250kw/2000rpm |
Hydraulic System | |
Type | Variable pluger pump + 1 gear pump |
Travel circuit | 34.3MPa |
Swing circuit | 28.4MPa |
Swing speed | 9.3r/min |
Bucket | |
Bucket capacity | 2.0-2.2m³ |
Bucket width | 1350-1530mm |
Travel System | |
Travel motors | Variable axial piston motor |
Travel shoes | 2X49 |
Travel speed | 5.3/3.2km/h |
Travel brakes | Pressure Release Mechanical Braking |
Gradeablity | 70%(35°) |
Ground clearance | 557mm |
Working Ranges | |
Arm length | 3381mm |
Max. digging reach at ground level | 11814mm |
Max. digging depth | 7800mm |
Max. digging heigh | 10924mm |
Max. dumping height | 7615mm |
Max. vertical wall digging depth | 7066mm |
Overall length | 12090mm |
Overall height (to top of boom) | 3590mm |
Overall width | 3490mm |
Shoe width | 600mm |
Overall height (to top of cab) | 3276mm |
Ground clearance of rear end | 1312mm |
Min.Ground clearance | 686mm |
212KW 2000rmp
1.8 m³
250KW 2000rmp
2.0 - 2.5 m³
280KW 2000rmp
2.5 - 2.8 m³
280KW 2000rmp
2.8 - 3.0 m³
Overseas marketing outsourcing services for small and medium-sized enterprises.